We were lucky enough to be visited by some of the people who work for the company who are currently building the new foot bridge in Sunderland, VolkerStevin. They set the school a design challenge – to design a new bridge. We had to think carefully about where the bridge would be located, what it would be made of, the colour it would be and any special moving feature it may have. The children have had a fantastic day working in small teams to design and discuss their bridges. They have blew staff away with their ideas and enthusiasm.
Once children had completed their designs, they even presented these to the rest of the class.
Take a look at some of their completed designs.
Comments are closed.